Archive: Case-File Chapters in Order, 2001 Onward
This archive lists the guide's material in a sensible reading order. The core is an eight-chapter case file that follows the former brewery site north of downtown San Antonio from the year brewing stopped to the questions it faces now. Around it sit worked scenarios, how-to guides, dated notes and reference pages.
The case file, chapter by chapter
- Case File 1: The Site When Brewing Stopped — the brewery campus in 2001: more than a century of brewing, the buildings left behind and the questions any buyer would face.
- Case File 2: The Sale and the First Plans (2002 Onward) — the 2002 sale to a local investment firm, the choice of a slow, retain-and-reuse strategy and the public planning context.
- Case File 3: The Groundwork Nobody Photographs — environmental checks, utilities, drainage and streets: the expensive groundwork that rarely gets photographed.
- Case File 4: The River Arrives — the public Museum Reach river extension, opened in 2009, and the value-capture question it raises.
- Case File 5: The First Anchors — a culinary school, a weekly market and restaurants as anchors that drew people before housing arrived.
- Case File 6: The Brewhouse Becomes a Hotel — how the 1894 brewhouse became a hotel in 2015, and what landmark conversions involve.
- Case File 7: Housing, Density and the Neighbourhood — housing on and around the site and the debate over rising costs in nearby neighbourhoods, with advice on studying change fairly.
- Case File 8: Open Questions for the 2020s — open questions for the 2020s: transit, parking, privately owned public space, affordability, heat and flooding.
Each chapter ends with a short list of the public bodies and publications it relies on. Read them in order the first time; afterwards, use them as reference.
Worked scenarios
These are clearly labelled hypothetical cases. They let readers practise the decisions that planners, owners and residents face, without claiming to describe what any real party did.
- Case: Public Space Decisions at a River Landing — designing the edge where a site meets the river.
- Case: A Mid-Sized City Inherits a Closed Brewery — what a city might do in the first years after a closure.
- Case: Deciding Which Brewery Buildings to Keep — sorting buildings into keep, adapt and clear.
How-to guides
Step-by-step pages for readers who want to go and look at the record themselves.
- How to read a San Antonio zoning case file
- How to request planning records from a Texas city
- How to draw a before-and-after land-use map
- How to trace a building’s past with old maps and directories
- How to estimate walking distance from a bus stop to a district
Dated notes
Shorter planning notes on specific cases, studies and changes. Each is dated so readers can judge whether it is still current.
- Getting to the District: An Access Note on Walking, Bikes, Buses and the River
- Active Frontages: How Ground-Floor Design Rules Shape a Street
- Street Closures and Event Permits: How a City Handles Weekend Crowds
- Outdoor Stages and Neighbours: Planning Notes on Sound and Performance Space
- Historic Preservation Tools Used on Former Industrial Sites
Reference
| Page | Use it for |
|---|---|
| Decoding Redevelopment Jargon | Planning, preservation and finance terms in plain English |
| Sources and Records: Where the Evidence Lives | Where the evidence lives, with notes on each source |
| Frequently asked questions | Short answers to common questions |
| About River North Redevelopment Notes | Who publishes the guide and why it is independent |
| Corrections and feedback | Corrections and suggestions |
About dates in this archive
Earlier versions of this page showed the same publication date for every item, which was not meaningful. Dates now appear on the pages themselves where they matter, and chapters are revised as sources are added. If you cite a page, note the date you read it. To return to the start, use the How a Shuttered Brewery Became a Neighbourhood link.