Masterclass: how to read a site plan

Site plans are the drawings submitted with development applications. They show where buildings, streets, parking and open space will go. They are also dense, technical and easy to misread. This lesson teaches you to read one methodically. It uses the kinds of plans prepared for large redevelopments, such as the former brewery site north of downtown San Antonio, but applies to any project.

Lesson 1: Orient yourself

Before reading anything else, find three things: the north arrow, the scale and the title block. The title block gives the project name, the date and revision number. Always note the revision; plans change between hearings, and an older revision may show things that were later removed.

Lesson 2: Find the boundary

A heavy line, often dashed, marks the property boundary. Inside it is what the applicant controls. Outside it are public streets, neighbours and, in the riverside case, the public river corridor. Many disagreements arise from confusing the two.

Lesson 3: Read the lines that limit building

Lesson 4: Identify buildings and uses

Buildings are usually outlined and labelled with use, height or storeys and floor area. Distinguish existing to remain, existing to be demolished and proposed; plans use different line types or shading for each. On an adaptive reuse project, this distinction tells you which historic buildings are being kept.

Lesson 5: Follow movement

Trace vehicle entrances, internal streets, loading areas and parking. Then trace pedestrian routes. Ask: where do the two cross? Is there a continuous walking route from the public sidewalk to the main entrances and the river?

Lesson 6: Look for phasing lines

Large projects often show phase boundaries. Phase 1 is what will be built first. Later phases may change substantially or never be built, so treat them as intentions.

Lesson 7: Read the notes and tables

Site plans usually carry a data table and general notes. The table summarises lot area, building floor area, number of homes, parking spaces provided and required, and open space. The notes may state conditions, such as a public access easement or a tree preservation requirement. Many important commitments hide here rather than in the drawing itself, so read every note at least once and compare the table figures with what the zoning allows.

Practice

Find any site plan in a city case file. In ten minutes, write down the revision date, the boundary, two setbacks, the number of buildings to remain and to be built, the main vehicle entrance and the main pedestrian route. If you can answer all six, you can read a site plan.

Sources

  • City of San Antonio Development Services Department — zoning maps, permit search and the Unified Development Code.
  • City of San Antonio — City Council and Zoning Commission agendas and minutes.
  • American Planning Association — planning education materials and the Planning magazine archive.